S3·E8 – Episode 8
2018-11-05 • 45 min
The bank holiday works schedule is disrupted when a trespassers is o the line outside of London, forcing the cancellation of all trains. However, the shutdown allows the engineers onto the track to renew large sections of the rail infrastructure.