S45·E4 – Lexington: Engineered For Accessibility
2023-10-19 • 27 min
A lally column stands in the way of the new open floor plan. As a solution, it is removed, and the ridge beam is replaced with a trio of engineered beams. The new landscape is previewed in 3D, and tips are shared for creating an accessible bathroom.